Industrial-Grade Manufacturing for Demanding Markets
At LETON POWER, our 1,000-strong engineering workforce and 5 fully automated production lines deliver unmatched scalability in diesel generator OEM/ODM services. As global demand for customized power solutions grows, we enable partners to secure orders confidently with:

  • 48-hour prototype response time
  • 15-30% faster production cycles vs industry average
  • 500+ units/month bulk order capacity

Why Global Clients Choose Our OEM/ODM Ecosystem

1. Human + Robotic Precision
5 auto-intelligent production lines – Fully automated assembly with robotic welding & AI quality inspection
1,000 Technical Experts – Cross-functional teams covering R&D, production, QC, and export
3-Shift Operation – 24/7 manufacturing readiness for urgent projects

2. Military-Grade Delivery Assurance

  • 30-Day Standard Lead Time for repeat models
  • 45-Day Complex Customization (up to 3000kVA)
  • On-Time Delivery Rate: 98.6% (2023 verified data)

3. Bulk Order Advantages

  • 5-Line Parallel Production eliminates bottlenecks
  • 30,000㎡ Parts Warehouse ensures material availability
  • Dedicated Export Team handles 200+ containers/month

OEM/ODM Solutions Engineered for Speed

CapabilityIndustry StandardLETON POWER
Prototype Development4-6 Weeks10-18 Days
MOQ Flexibility50+ Units20 Units
Custom Parts Inventory30-Day Wait72-Hour Access

Case Study: 1,200-Unit Emergency Order
A Middle Eastern distributor secured a government tender requiring:

  • ▸ 8-week delivery of 1,200 silent diesel generators
  • ▸ Custom Arabic control panels
  • ▸ Military-grade corrosion protection

Our automated lines and workforce delivered:
✓ Production completed in 34 days
✓ 100% passed third-party IP55 testing
✓ 40 containers shipped simultaneously

Your Customization Roadmap
Phase 1: Technical Blueprinting (3-5 Days)

  • Power/voltage mapping
  • Compliance review (CE/UL/etc)

Phase 2: Robotic Production (15-25 Days)

  • Component stamping (2000T press)
  • Automated rotor balancing
  • AI-assisted performance calibration

Phase 3: Rapid Global Dispatch (5 Days)

  • Export packing with anti-corrosion VCI
  • Real-time shipment tracking
  • Local compliance documentation

4 Competitive Advantages
65% Lower Rework Rate via automated optical inspection
1 Prototype = 1 Dedicated Team from design to delivery
Bilingual QC Reports (Chinese + Your Language)
Spare Parts Pre-Loading for faster end-user maintenance

Request Capacity Verification
Email our OEM project team at [Your Email] with:

  • Required power range/kVA
  • Annual volume estimate
  • Target certifications

LETON POWER – Where industrial-scale manufacturing meets white-glove OEM/ODM execution.