Industrial-Grade Manufacturing for Demanding Markets
At LETON POWER, our 1,000-strong engineering workforce and 5 fully automated production lines deliver unmatched scalability in diesel generator OEM/ODM services. As global demand for customized power solutions grows, we enable partners to secure orders confidently with:
- 48-hour prototype response time
- 15-30% faster production cycles vs industry average
- 500+ units/month bulk order capacity
Why Global Clients Choose Our OEM/ODM Ecosystem
1. Human + Robotic Precision
✓ 5 auto-intelligent production lines – Fully automated assembly with robotic welding & AI quality inspection
✓ 1,000 Technical Experts – Cross-functional teams covering R&D, production, QC, and export
✓ 3-Shift Operation – 24/7 manufacturing readiness for urgent projects
2. Military-Grade Delivery Assurance
- 30-Day Standard Lead Time for repeat models
- 45-Day Complex Customization (up to 3000kVA)
- On-Time Delivery Rate: 98.6% (2023 verified data)

3. Bulk Order Advantages
- 5-Line Parallel Production eliminates bottlenecks
- 30,000㎡ Parts Warehouse ensures material availability
- Dedicated Export Team handles 200+ containers/month
OEM/ODM Solutions Engineered for Speed
Capability | Industry Standard | LETON POWER |
---|---|---|
Prototype Development | 4-6 Weeks | 10-18 Days |
MOQ Flexibility | 50+ Units | 20 Units |
Custom Parts Inventory | 30-Day Wait | 72-Hour Access |
Case Study: 1,200-Unit Emergency Order
A Middle Eastern distributor secured a government tender requiring:
- ▸ 8-week delivery of 1,200 silent diesel generators
- ▸ Custom Arabic control panels
- ▸ Military-grade corrosion protection
Our automated lines and workforce delivered:
✓ Production completed in 34 days
✓ 100% passed third-party IP55 testing
✓ 40 containers shipped simultaneously
Your Customization Roadmap
Phase 1: Technical Blueprinting (3-5 Days)
- Power/voltage mapping
- Compliance review (CE/UL/etc)
Phase 2: Robotic Production (15-25 Days)
- Component stamping (2000T press)
- Automated rotor balancing
- AI-assisted performance calibration
Phase 3: Rapid Global Dispatch (5 Days)
- Export packing with anti-corrosion VCI
- Real-time shipment tracking
- Local compliance documentation

4 Competitive Advantages
① 65% Lower Rework Rate via automated optical inspection
② 1 Prototype = 1 Dedicated Team from design to delivery
③ Bilingual QC Reports (Chinese + Your Language)
④ Spare Parts Pre-Loading for faster end-user maintenance
Request Capacity Verification
Email our OEM project team at [Your Email] with:
- Required power range/kVA
- Annual volume estimate
- Target certifications
LETON POWER – Where industrial-scale manufacturing meets white-glove OEM/ODM execution.